Every day without a permit is a day without revenue. Hoyos Engineering provides structural engineering for commercial tenant improvements, restaurant buildouts, and retail renovations across South Florida — designed to get through permitting fast so your business opens on schedule.
Restaurant owners building out new locations or renovating existing spaces
Retail tenants customizing leased commercial space
Medical and dental office buildouts requiring structural modifications
Landlords and property managers preparing spaces for new tenants
General contractors managing commercial renovation projects
Franchise operators opening new South Florida locations
Most commercial buildouts involve more structural work than tenants expect. Removing or relocating a wall, adding a mezzanine, installing heavy commercial kitchen equipment, modifying the roof for HVAC systems, or changing the building's occupancy classification — all of these trigger structural engineering requirements.
South Florida's building departments are thorough. An incomplete or poorly engineered submittal does not just get rejected — it goes to the back of the line. One permit rejection can cost you weeks. The fastest way through permitting is a structural package that is correct and complete the first time.


Step 1: Scope Review
Share your buildout plans, lease requirements, and timeline. We identify the structural engineering scope and provide a clear proposal.
Step 2: Structural Design
We develop structural engineering drawings for your buildout — wall modifications, floor load analysis, equipment support framing, roof penetrations, and any structural changes required by your space configuration.
Step 3: Team Coordination
We work directly with your architect, MEP engineer, and general contractor to ensure the structural design integrates with all other disciplines and meets your lease requirements.
Step 4: Permit-Ready Delivery
You receive sealed structural drawings ready for permit submission. If the building department has comments, we respond directly and resolve them without delay.
Structural engineering drawings sealed by a licensed Florida PE
Wall modification and removal design (load-bearing analysis)
Floor load analysis for heavy equipment (commercial kitchens, machinery)
Mezzanine and platform structural design
Roof penetration and HVAC support engineering
Occupancy classification change structural review
ADA compliance structural considerations
Permit coordination and building department comment response
Coordination with your architect, MEP consultant, and contractor
Do not let engineering delays push back your opening date. Contact Hoyos Engineering today for commercial buildout structural plans that get permitted the first time.
Answers to the Most Common Questions For Property Owners, Contractors, and Condo Boards
If your buildout involves any modification to the building's structural system — wall removals, new openings, mezzanines, heavy equipment loading, or roof modifications — then yes. Most commercial buildouts in South Florida require structural engineering as part of the permit package.
Most commercial buildout structural packages are completed in one to three weeks, depending on complexity. We understand that your opening date is a deadline, and we plan accordingly.
Yes. We integrate directly with your full project team — architect, MEP, interior designer, and general contractor — to ensure seamless coordination.
Yes. Restaurant buildouts often involve heavy kitchen equipment, grease traps, walk-in coolers, hood exhaust systems, and roof-mounted HVAC — all of which may have structural implications. We address these requirements specifically in our design.
We provide commercial buildout engineering across Miami-Dade, Broward, and Palm Beach counties.
Free initial consultation. No obligation. We typically respond within 24 hours.
Email: [email protected]
Phone: (954) 815-2941
monday: 8am - 5pm
tuesday: 8am - 5pm
wednesday: 8am - 5pm
thursday: 8am - 5pm
friday: 8am - 5pm
Copyright 2026. Hoyos Engineering. All rights reserved.